Searching...
Reply

Slow NBN? Read this..

mrklun

NBN Co may flip problem FTTN lines to different tech.

 

Premises in the NBN’s fibre-to-the-node (FTTN) footprint with lines incapable of 25 Mbps peak rates could be moved over to an alternate access technology if all other options fail.

NBN Co revealed last week that six percent of all active FTTN lines - servicing 54,000 premises - are only capable of maximum downlink speeds of between 12 Mbps and 25 Mbps.

That is below the minimum 25 Mbps benchmark for peak speeds set by Prime Minister Malcolm Turnbull when he shifted the NBN over to the multi-technology mix (MTM).

NBN Co’s challenge now is to find a way to improve the performance of the NBN for these customers. iTnews understands that the last resort option is to shift them off FTTN altogether.

However, it is unclear how many of the 54,000 FTTN users fall into this category.

At present, an unknown number of these lines are in areas subject to “co-existence profile settings”.

An 18-month window is provided for customers to shift from ADSL to FTTN. To prevent newer FTTN connections from interfering with adjacent ADSL services during this time, certain settings can be put in place which prevent NBN Co from maximising the speed of the FTTN services.

Once the co-existence period lifts and VDSL vectoring is optimised, it is understood users could see peak speed capabilities increase by between 5 Mbps and 10 Mbps.

For those whose lines still can’t achieve a peak bitrate of 25 Mbps, NBN Co will try to make repairs to the copper, before looking at other options.

One option could be to deploy a micronode in the area, which would reduce the distance of copper used in the end-to-end connection.

However, NBN Co has the option to serve the premises using an alternate access technology should the FTTN connection continue not to deliver. The options on the table include fibre-to-the-curb (FTTC), fixed wireless, or satellite.

The option of having problem FTTN connections upgraded to FTTC before 2020 is likely to be an attractive proposition for those with the poorest-performing FTTN services.

NBN Co CEO Bill Morrow told a financial results presentation today that the company had tried to identify premises that would have trouble hitting minimum peak speeds in the design phase. Many of them would be served by FTTC, for which construction is underway.

Morrow said a “number” of the million homes earmarked for the FTTC footprint were presently located a large distance from an exchange, on “long copper loop lengths”.

“Where we can’t meet the minimum 25 Mbps standard on a peak information rate basis, those are going to be largely slated for FTTC technology,” he said.

Morrow said once an area had been designated FTTN, the company was typically confident that the copper would be fit-for-purpose.

“We’re not finding material problems with copper as we go forward into a neighbourhood that would warrant flipping that technology to FTTC,” he said.

However, the option exists to flip a small number of premises over to FTTC or another technology after the FTTN build is finished, in the event those premises have under-performing connections that cannot be rectified using any other means.

 

Breaks $1bn revenue barrier 

Clarity of NBN Co's approach to ensuring its entire network was capable of peak information rates of 25 Mbps or more came as the company announced its full year results.

The full year results saw the company hit both financial and rollout targets: it exceeded the number of premises ready for service by 300,000 compared to its corporate plan targets, and broke the $1 billion revenue barrier, as it had promised to do back in February.

"NBN Co performed well against plan in fiscal 2017, and continues to with almost six million homes and businesses able to connect and nearly three million using services on the network today," Bill Morrow said in a statement.

"The momentum is undeniable.”

 

Source: IT News

Re: Slow NBN? Read this..

SamSam

Very interesting. So glad and lucky I'm in FTTP area but surely this doesn't surprise to many people? Everyone knew the copper in a lot (not all, let's be fair) of places was of poor quality. Between that and the way the technology works itself, allowing distance (of signal loss) to become a factor really opened themselves up to this. I know there were other benefits of FTTP including speed to connection and cost (or at least perceived benefits) but I always thought it was a bad idea.

 

What will be interesting, is how this is handled. It's on NBNCo to provide a line speed of at least 25Mbps. If they aren't, who goes after NBNCo? The ISP because they have customers complaining, driving up costs and possibly leaving? Not to mention brand damage. Or is it the customer? I feel it's unlikely but a small amount may chase NBNCo directly if they are technically minded and have a good understanding of this stuff. 

____________________________________________________________________________________________________________________________
I do not represent Optus. The views, opinions and advice expressed in my posts are my own
Highlighted

Re: Slow NBN? Read this..

petergdownload

I think the NBN cops some of this unfairly. Politicians and Publishers find it easy to poke at. As in many times of its development, the NBN has been performing as anticipated and it will take time for it to be finished and running properly everywhere.

 

NBNCo is ultimately required to hit 25Mbps everywhere, but this is not required until the rollout is complete. Until then 12Mbps is considered a reasonable ask. This is because of things like running two technologies down the same wires as the article  mentioned.

 

I agree that the "tough" houses should be connected last. Ideally the NBN should have rolled through the cities first and then the country regions. This would have made a much, much better financial return much earlier. But for political reasons this was considered unviable, so we ended up doing a mix of inner city and regional (and the rollout speed slowed considerably).

 

Currently most of these "tough" houses are looking to use FTTN. My experience has been that some areas go "Live" by the NBNCo but when you type an address into the NBNCo site it says "Further Work is Required for your house". What this usually means is the house is > 750m from the node and speeds >12Mbps can't be guaranteed. Currently NBNCo are building "mini nodes" that end up servicing a few houses further out.

 

 

Regards

 

Peter Gillespie

Post a Reply
Top Contributors
105 Kudos
37 Kudos
29 Kudos
12 Kudos
12 Kudos